Mantis Bug Tracker

View Issue Details Jump to Notes ] Issue History ] Print ]
IDProjectCategoryView StatusDate SubmittedLast Update
0009722Dwarf FortressDwarf Mode -- Jobs, Farming/Farmer's Workshoppublic2016-05-04 21:582016-05-06 19:41
ReporterVeroule 
Assigned ToKnight Otu 
PrioritynormalSeverityminorReproducibilitysometimes
StatusacknowledgedResolutionreopened 
PlatformLinux VirtualBox x64OSWindowsOS Version8.1
Product Version0.42.06 
Target VersionFixed in Version 
Summary0009722: Dwarf received new job while handling animal to be shorn, cancels cancels second job (Handling dangerous creature)
DescriptionWhen a dwarf is in the middle of a shearing job the assignment system will sometimes select them for an other job. The cancellation message comes up but no other disruptions have been noted, the shearing job completes correctly and a different dwarf usually has handled the other job by then.
Steps To ReproduceIn short just having some shearing to do is enough, but longer procedure for the guarantee...

Pen a good number of animals to be shorn a long ways from the farmers workshop. Turn on all labors on one dwarf, turn off all labors for all other dwarves. Put shearing on repeat, and create as many other jobs as possible once the dwarf starts shearing.
TagsNo tags attached.
Attached Files

- Relationships
related to 0000184acknowledgedKnight Otu After milking/shearing, dwarf cancels next task with "Handling dangerous creature" 

-  Notes
(0035081)
PatrikLundell (reporter)
2016-05-05 02:24

I've seen all manner of non animal handling jobs being interrupted by "handling dangerous creature", which probably are caused by an interruption of jobs, as stated. I've encountered interruption spam, however, when a butcher would start to haul trade goods which an animal was due for butchering, so I gave up and disabled trade goods hauling on the butchers.
(0035083)
Knight Otu (manager)
2016-05-05 05:44

Duplicate of 0000184.
(0035089)
Knight Otu (manager)
2016-05-06 14:37

Veroule made the case that this issue is different enough from 0000184 to not necessarily be a duplicate, so I'm reopening it.
(0035090)
Veroule (reporter)
2016-05-06 19:41

Thank you for updating the summary to improve clarity.

- Issue History
Date Modified Username Field Change
2016-05-04 21:58 Veroule New Issue
2016-05-05 02:24 PatrikLundell Note Added: 0035081
2016-05-05 05:44 Knight Otu Note Added: 0035083
2016-05-05 05:44 Knight Otu Relationship added duplicate of 0000184
2016-05-05 05:44 Knight Otu Status new => resolved
2016-05-05 05:44 Knight Otu Resolution open => duplicate
2016-05-05 05:44 Knight Otu Assigned To => Knight Otu
2016-05-06 14:37 Knight Otu Note Added: 0035089
2016-05-06 14:37 Knight Otu Status resolved => acknowledged
2016-05-06 14:38 Knight Otu Relationship replaced related to 0000184
2016-05-06 14:40 Knight Otu Resolution duplicate => reopened
2016-05-06 14:40 Knight Otu Summary Dwarf cancels job: Handling dangerous creature. => Dwarf received new job while handling animal to be shorn, cancels cancels second job (Handling dangerous creature)
2016-05-06 19:41 Veroule Note Added: 0035090